- Building Information
Cohan
(Aisne, France)
Saint-Jean-Baptiste
Surveyed: 1977, 1980-83, 2014
- Locator Map
Cohan (Aisne, France) - Saint-Jean-Baptiste
- Disclaimer
The dating found here is based on the work of John James, and is meant on this site to serve as a starting point. James' dating is derived from a system that uses his interpretation of the development of capitals over time as the basis for chronology, among other factors. His goal is to refine the dating to within years rather than decades. I have not fully embraced James' methodology, and will be developing this page from its current state to one which is admittedly more conservative. The relative expenditure values found in the Timeline are also based on James' work, and I believe these to be reasonably reliable. They are intended only to give a sense of the amount of work involved in each decade.

I have added the idea of the "project" as a way of separating work in buildings. In my mind, a "project" is a discrete section of work in a building that resulted from the one-time acquisition of funding. "Projects" are generally separated by at least a decade where no work was being done. It is my view that it would have been unwise to start a "project" that could not be finished and protected from the elements, and as such a "project" usually involved a wing or multiple wings of a building, from floor to roof. Rural churches, which could only secure small amounts of funding at irregular intervals, often were the result of many small projects, while the great churches, which benefitted from relatively consistent funding, may have involved only a few large projects.
- Timeline with Relative Expenditure (if available, in building units)



- Project A - 1170s - Phase 1 - east 6c
Sets out apses to 5 or 6 courses; chapel on south intended, but not built;
- Project A - 1180s - Phase 2 - apse (d)
Apse and transept walls together with dado arcades and for a much taller building ; stairs same all the way up;
- Project A - 1180s - Phase 3 - nave 1
First bay of the nave with thick ribs to chapel and aisle;
- Project A - 1180s - Phase 4 - apse (v)
Apse and transept vaults in different campaigns with double oculi over triplet windows;
- Project A - 1190s - Phase 5 - nave (a), W-w
Nave three bays with west wall, portal, drums and pilasters at each end; built to underside of rose window in one campaign;
- Project A - 1190s - Phase 6 - nave (c)
Clerestory windows and vaults to above rose; no work on the aisles;
- Project B - Later - Phase 7 -
Tower collapsed into side walls of apse; crossing strengthened and rebuilt with vaults at a lower level;