- Building Information
Ferrières-en-Brie
(Seine-et-Marne, France)
Saint-Remi
Surveyed: 1972-74, 1977, 1992-98, 2015
- Locator Map
Ferrières-en-Brie (Seine-et-Marne, France) - Saint-Remi
- Disclaimer
The dating found here is based on the work of John James, and is meant on this site to serve as a starting point. James' dating is derived from a system that uses his interpretation of the development of capitals over time as the basis for chronology, among other factors. His goal is to refine the dating to within years rather than decades. I have not fully embraced James' methodology, and will be developing this page from its current state to one which is admittedly more conservative. The relative expenditure values found in the Timeline are also based on James' work, and I believe these to be reasonably reliable. They are intended only to give a sense of the amount of work involved in each decade.

I have added the idea of the "project" as a way of separating work in buildings. In my mind, a "project" is a discrete section of work in a building that resulted from the one-time acquisition of funding. "Projects" are generally separated by at least a decade where no work was being done. It is my view that it would have been unwise to start a "project" that could not be finished and protected from the elements, and as such a "project" usually involved a wing or multiple wings of a building, from floor to roof. Rural churches, which could only secure small amounts of funding at irregular intervals, often were the result of many small projects, while the great churches, which benefitted from relatively consistent funding, may have involved only a few large projects.
- Timeline with Relative Expenditure (if available, in building units)



- Project A - Earlier - Phase 1 -
Something occupied the space on either side of the apse, leading to many of the axial anomalies and the confused erection schedule in the east.
- Project B - 1200s - Phase 2 - east (a)
East bases over sloping floor; both chapels added while other walls only partly up, each with different vertical dimensions so that as triforium was being built in the east the aisles were being built in the west, all in many medium-sized campaigns, with the carving suggesting that one master in particular had worked here on a number of occasions.
- Project B - 1210s - Phase 3 - west (a)
Western aisle capitals, middle triforium after a pause and in a number of small campaigns.
- Project B - 1220s - Phase 4 - nave (c,v)
West three bays of the triforium, and west wall and high vaults; the rose is recent.