- Building Information
Acy-en-Multien
(Oise, France)
Saints-Pierre-et-Paul
Surveyed: 1972-74, 1980-83, 1992-98, 2003, 2015
- Locator Map
Acy-en-Multien (Oise, France) - Saints-Pierre-et-Paul
- Disclaimer
The dating found here is based on the work of John James, and is meant on this site to serve as a starting point. James' dating is derived from a system that uses his interpretation of the development of capitals over time as the basis for chronology, among other factors. His goal is to refine the dating to within years rather than decades. I have not fully embraced James' methodology, and will be developing this page from its current state to one which is admittedly more conservative. The relative expenditure values found in the Timeline are also based on James' work, and I believe these to be reasonably reliable. They are intended only to give a sense of the amount of work involved in each decade.

I have added the idea of the "project" as a way of separating work in buildings. In my mind, a "project" is a discrete section of work in a building that resulted from the one-time acquisition of funding. "Projects" are generally separated by at least a decade where no work was being done. It is my view that it would have been unwise to start a "project" that could not be finished and protected from the elements, and as such a "project" usually involved a wing or multiple wings of a building, from floor to roof. Rural churches, which could only secure small amounts of funding at irregular intervals, often were the result of many small projects, while the great churches, which benefitted from relatively consistent funding, may have involved only a few large projects.
- Timeline with Relative Expenditure (if available, in building units)





- Project A - 1080s - Phase 1 - apse
Apsidiole and two bays to west crossing piers.
- Project A - 1090s - Phase 2 - tower base
Base to south tower with rib vaults, while shortly afterwards the lower courses of the west crossing piers and nave piers to the second bay, and then in the next campaign the next bay; no vaults were planned for the aisles; lower stage of tower
- Project B - 1130s - Phase 3 - nave (a)
Nave aisle capitals, arcade arches and corbels for vaults with heights that were altered in a later campaign.
- Project B - 1130s - Phase 4 - crossing w1
- Project B - 1130s - Phase 5 - nave(c)
The spandrel over the arch built with the upper walls of nave to the top of the clerestory capitals.
- Project B - 1140s - Phase 6 - east (a)
Two eastern bays between old apse and the west crossing arch; opening left for transepts; two bays between apsidiole and nave removed.
- Project C - 1180s - Phase 7 - east (v)
Eastern vaults completed